Category: Blog

Testing, Inspection and Maintenance of BOP II

Testing, Inspection and Maintenance of BOP 2.2 Pressure Tests: When performing the low pressure test, do not apply a higher pressure and bleed down to the low test pressure. The higher pressure could initiate...

Testing, Inspection and Maintenance of BOP

Testing, Inspection and Maintenance of BOP 1.0 Testing Periods Pressure test on the well control equipment should be conducted at least once every 21 days. After setting, CSG Prior to entering a known transition...

Inspection, Testing and Sealing Components

Drilling Equipment Inspection, Testing and Sealing Components Welcome to Chess Subsea IWCF Surface and Subsea Well Control for Drilling Engineers | Supervisors. The following topics will be discussed on this session: Testing, Inspection and...

Offshore Oil Drilling Industry – Full Documentation

Offshore Oil Drilling Industry – Full Documentation https://www.youtube.com/watch?v=_jNSTIpBa1U << Click here to return to Free IWCF Surface and Subsea Well Control Blogs Advanced Subsea Production System (SPS) Professional Courses Subsea production system is associated...