Deprecated: Creation of dynamic property PopupAllyDefaultTemplate::$style_template_checked_replace is deprecated in /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php on line 108

Deprecated: Creation of dynamic property PopupAllyCleanTemplate::$style_template_checked_replace is deprecated in /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/clean/definition.php on line 117
Subsea Cost Estimation - Chess Subsea Engineering

Subsea Cost Estimation

Subsea Cost Estimation

Subsea cost refers to the cost of the whole project, which generally includes the capital expenditures (CAPEX) and operation expenditures (OPEX) of the subsea field development. During this course individuals will develop a detailed understanding of cost incurred during the life cycle of the field. The will learn about Christmas tree costing, manifold costing and flow line costing with respect to subsea field development.

The course emphasizes a systems approach to subsea costing. Individual and group exercises are used throughout the course including a case study, basic component selection, and high level project execution plans for subsea development. Course instructors are core subsea professionals.


Contents

Day 1

  • Subsea Capital Expenditures (CAPEX)
  • Cost Estimation Methodologies
  • Cost Capacity Estimation
  • Factored Estimation
  • Cost Estimation Model
  • Cost-Driving Factors

Day 2

  • Work Breakdown Structure
  • Cost Estimation Process
  • Subsea Equipment Costs
  • Overview of Subsea Production System
  • Subsea Trees
  • Cost-Driving Factors
  • Cost Estimation Model

Day 3

  • Subsea Manifolds
  • Cost-Driving Factors
  • Cost Estimation Model
  • Flowlines
  • Cost-Driving Factors
  • Cost Estimation Model
  • Testing and Installation Costs
  • Testing Costs
  • Installation Costs
  • Project Management and Engineering Costs

Day 4

  • Subsea Operation Expenditures (OPEX)
  • Life cycle Cost of Subsea System

Day 5

  • Case Study: Subsea System CAPEX Estimation

Structure
Subsea Field Development course is based on a 5 days training period and consists of 2 elements:

  • Five-days classroom modules to obtain theoretical knowledge of the relevant material.
  • Real time operational videos that enable attendees to develop a practical understanding of systems, operations and procedures.

Career Opportunity
After completion of this course; you could work for:

  • IOC’s Company as a Subsea Project Engineer
  • IOC’s Company as a Subsea Cost Engineer
  • Subsea Production Systems or Offshore Company as Cost Engineer
  • Subsea Production Systems or Offshore Company as Project Engineer

For further information on course fees, content details or registration please contact info@chesssubseaengineering.com

Chess Subsea Engineering

Administration Team

You may also like...