Deprecated: Creation of dynamic property PopupAllyDefaultTemplate::$style_template_checked_replace is deprecated in /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php on line 108

Deprecated: Creation of dynamic property PopupAllyCleanTemplate::$style_template_checked_replace is deprecated in /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/clean/definition.php on line 117
Introduction to Pipeline Leak Repair Operations Management - Chess Subsea Engineering

Introduction to Pipeline Leak Repair Operations Management

Introduction to Pipeline Leak Repair Operations Management

This online course gives an Introduction to Pipeline Leak Repair Operations Management. It acts as a basic pre-requisite and foundation to Pipeline Leak Repair Operations Management.

This module covers Pipeline Repairs, Composite Repair of Pipelines, Welding and Hot Tap Metallurgy Considerations, Hot Tap and Stopple Basics, Hot Tap and Line Stops Operations, Pipeline Repair Products, Flushing Procedure, Pipeline Flushing Procedure, Hydrotest Procedure, Standalone Job Hazard Analysis (JSA) and more


Key learning areas

  • Understand basic principles of Pipeline Leak Repair Operations Management
  • Appreciate of Pipeline Leak Repair Operations / Practice
  • Understand Pipeline Leak Repair Operations Management
    Tools & Resources

Contents

Module 1:Understanding Pipeline Leak Repairs

  • Crude Oil Overview
  • Overview of Pipelines
  • Pipeline Repair Overview
  • Pipeline Defect Assessment/Considerations
  • Pipeline Repair Methods
  • Emergency Repair of Carbon Steel Pipelines
  • Emergency Repair of Subsea Carbon Steel Pipelines
  • Emergency Repair of Glass Reinforced Plastic (GRP) Pipelines
  • Composite Repair of Pipelines
  • Welding and Hot Tap Metallurgy Considerations
  • Hot Tap and Stopple Basics
  • Hot Tap and Line Stops Operations
  • Purging, Flooding/Filling, Hydrotest and Pigging
  • In‐Service Repairs of Pipeline Components
  • Pipeline Repair Products

Module 2: Field Operations / Practice – Tools & Resources

  • Pipeline Repair Procedure
  • Clamp + Ring Installation Procedure
  • Composite Sleeve Repair Procedure
  • Emergency Pipeline Repair Procedure
  • Flange + Repair Ring Installation Procedure
  • Split + Sleeve Installation Procedure
  • Mechanical Applied Full Encirclement Sleeve Procedure
  • Welds + End Installation Procedure
  • GRP Repair Procedure
  • Pipeline Leak Management Procedure
  • Hot Tap Procedure
  • Method Statement for Hot Tapping
  • Hot Tap Checklist
  • Hot Tap Safety Procedure
  • Safety Procedure for Hot Tap
  • Hot Tapping Quality Procedure
  • Quality Control Procedure for Hot Tap
  • Flushing Procedure
  • Pipeline Flushing Procedure
  • Hydrotest Procedure
  • Procedure for Hydrotest of Pipelines
  • Procedure for Hydro testing
  • Guidelines for Project Execution Plan
  • Site HSE Plan
  • Risk Assessment Procedure
  • Accident ‐ Incident Reporting Procedure
  • Emergency Evacuation Procedure
  • Environmental Protection Procedure
  • Fire Fighting Procedure
  • Confined Space Work Procedure
  • Occupational Health Risk Assessment Procedure
  • Management of Subcontractors Procedure
  • HSE Meeting Procedure
  • Safe Lifting Practice Guide
  • Safe Radiography Procedure
  • Site Security Plan
  • Welding and Cutting Procedure
  • Safe Waste Management Procedure
  • Safe Housekeeping Procedure
  • PPE Procedure
  • Planning and Scheduling Procedure
  • Procurement Control Procedure
  • Progress Reporting Procedure
  • Quality Plan
  • Quality Management Plan
  • Project Execution Plan – Guidelines
  • Project Quality Plan
  • Project Planning, Monitoring and Control Procedure
  • Document Control Procedure

Module 3: Standalone Job Hazard Analysis (JSA)

  • JSA ‐ Arc Welding, Cutting and Grinding
  • JSA ‐ Cold Cutting
  • JSA ‐ Confined Space Entry
  • JSA ‐ Excavation and Back filling
  • JSA ‐ Gas Welding
  • JSA ‐ Heat Treatment
  • JSA ‐ Heavy Lifting in Hazardous Areas
  • JSA – Hydro testing
  • JSA ‐ Manual Excavation
  • JSA ‐ Mechanical Excavation
  • JSA ‐ Nitrogen Purging
  • JSA ‐ Pig Launching
  • JSA ‐ Pig Retrieval
  • JSA ‐ Pressure Testing
  • JSA ‐ Radiography Work

Course Registration

For Registration details; please download the form here.

For further information on course fees or content details; please contact info@chesssubseaengineering.com

Chess Subsea Engineering

Administration Team

You may also like...