Deprecated: Creation of dynamic property WPRTSP::$version is deprecated in /home2/ab29608/public_html/wp-content/plugins/wp-real-time-social-proof/wprtsp.php on line 205

Deprecated: Creation of dynamic property wps_Tax_CTP_Filter::$cpt is deprecated in /home2/ab29608/public_html/wp-content/plugins/wp-symposium-pro/forums/wps_custom_taxonomy_forum.php on line 357
Introduction to Pipeline Construction Operations Management - Chess Subsea Engineering

Introduction to Pipeline Construction Operations Management

Introduction to Pipeline Construction Operations Management

This online course gives an Introduction to Pipeline Construction Operations Management. It acts as a basic pre-requisite and foundation to Pipeline Construction Operations Management.

This module covers Subsea Pipeline Construction Method Statement, Pipe Handling Procedure, Excavation and Backfill Procedure, Pipeline Stringing Procedur, Pipelay Procedure, Welding Procedure for Pipeline Construction, Field Joint Coating Method Statement, Procedure for Field Joint Coating, Flushing Procedure, Pipeline Flushing Procedure, Procedure for Hydrotest of Pipelines, Procedure for Hydrotesting, Hydrotest Procedure, Radiographic Inspection Procedure, Trenchless Pipelay Procedure, Road and River Crossing Procedure, Pipeline Crossing Procedure, HDD Crossing Procedure, Offshore Pipeline Construction Method Statement, Procedure for Pipeline Pre‐Commissioning, Pig Launching and Receiving, Operations Management and more.


Key learning areas

  • Understand basic principles of Pipeline Construction Operations Management
  • Appreciate of Pipeline Construction Operations Management Operations / Practice
  • Understand Pipeline Construction Operations Management Tools & Resources
  • Understand Pipeline Construction Operations Management JSA

Contents

Module 1: Understanding Pipeline Construction

  • Overview of Pipelines
  • Overview of Pipeline Construction
  • Offshore Pipeline Construction
  • Pipeline Construction Activities
  • Pipe Laying Methods
  • Pipe Welding Method and Process
  • Pipe Lowering
  • Field Joint Anti‐Corrosion Coating
  • Pipeline Flooding/Flushing
  • Pipeline Hydrotesting
  • Pigging in Pipeline Pre‐Construction
  • How Pigs Work
  • Pig Traps – Launchers and Receivers
  • Why Pig get Stuck and How to Avoid It
  • Cathodic Protection of Pipelines
  • Pipeline Construction – Key Things to Know
  • Safe Welding and Cutting Operations

Module 2: Field Operations / Practice – Tools & Resources

  • Pipeline Construction Method Statement
  • Subsea Pipeline Construction Method Statement
  • Pipe Handling Procedure
  • Excavation and Backfill Procedure
  • Pipeline Stringing Procedure
  • Pipelay Procedure
  • Welding Procedure for Pipeline Construction
  • Field Joint Coating Method Statement
  • Procedure for Field Joint Coating
  • Flushing Procedure
  • Pipeline Flushing Procedure
  • Procedure for Hydrotest of Pipelines
  • Procedure for Hydrotesting
  • Hydrotest Procedure
  • Radiographic Inspection Procedure
  • Trenchless Pipelay Procedure
  • Road and River Crossing Procedure
  • Pipeline Crossing Procedure
  • HDD Crossing Procedure
  • Offshore Pipeline Construction Method Statement
  • Procedure for Pipeline Pre‐Commissioning
  • Pig Launching and Receiving Procedure
  • Procedure for Pig Launching and Receiving
  • Pipeline Pigging Charts
  • Procedure for Stuck Pig Removal
  • Safety Guidelines in Pipeline Pigging
  • Site HSE Plan
  • Risk Assessment Procedure
  • Accident ‐ Incident Reporting Procedure
  • Emergency Evacuation Procedure
  • Environmental Protection Procedure
  • Fire Fighting Procedure
  • Confined Space Work Procedure
  • Occupational Health Risk Assessment Procedure
  • Management of Subcontractors Procedure
  • HSE Meeting Procedure
  • Safe Lifting Practice Guide
  • Safe Radiography Procedure
  • Site Security Plan
  • Safe Waste Management Procedure
  • Safe Housekeeping Procedure
  • Safe Excavation Procedure
  • Safe Welding and Cutting Procedure
  • PPE Procedure
  • Planning and Scheduling Procedure
  • Procurement Control Procedure
  • Progress Reporting Procedure
  • Quality Plan
  • Quality Management Plan
  • Project Execution Plan – Guidelines
  • Project Quality Plan
  • Project Planning, Monitoring and Control Procedure
  • Document Control Procedure

Module 3: Standalone Job Hazard Analysis (JSA)

  • JSA ‐ Arc Welding, Cutting and Grinding
  • JSA ‐ Cold Cutting
  • JSA ‐ Confined Space Entry
  • JSA ‐ Excavation and Backfilling
  • JSA ‐ Gas Welding
  • JSA ‐ Heat Treatment
  • JSA ‐ Heavy Lifting in Hazardous Areas
  • JSA – Hydrotesting
  • JSA ‐ Manual Excavation
  • JSA ‐ Mechanical Excavation
  • JSA ‐ Nitrogen Purging
  • JSA ‐ Pig Launching
  • JSA ‐ Pig Retrieval
  • JSA ‐ Pressure Testing
  • JSA ‐ Radiography Work

Course Registration

For Registration details; please download the form here.

For further information on course fees or content details; please contact info@chesssubseaengineering.com

Chess Subsea Engineering

Administration Team

You may also like...


Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home2/ab29608/public_html/wp-includes/functions.php on line 5464