Deprecated: Creation of dynamic property WPRTSP::$version is deprecated in /home2/ab29608/public_html/wp-content/plugins/wp-real-time-social-proof/wprtsp.php on line 205

Deprecated: Creation of dynamic property wps_Tax_CTP_Filter::$cpt is deprecated in /home2/ab29608/public_html/wp-content/plugins/wp-symposium-pro/forums/wps_custom_taxonomy_forum.php on line 357
Subsea Survey, Positioning & Installation and Introduction to Subsea Control system - Chess Subsea Engineering

Subsea Survey, Positioning & Installation and Introduction to Subsea Control system

This course gives a detailed understanding of subsea field preparation operations.  It discusses at length subsea survey techniques, how to position subsea systems on the seabed, subsea system installations and mathematics involved in rope selection for deployment. This course features case study of subsea system installation from project management perspective. It also introduces subsea control systems.


Outcome

  • To gain total understanding  of the basis, significance and application of subsea surveying techniques.
  • To gain the knowledge required to understand the factors influencing the installation of subsea equipment including the effects of geotechnics.
  • Understanding of the methods and equipment used for subsea installation of pipelines, risers and umbilicals.

Outline Of Syllabus

  • Subsea Surveying and Geomatics : Introduction to the principles of subsea surveying and geomatics including bathymetry and seismic surveys, positioning systems (surface positioning, visual positioning, GPS and electromagnetic positioning techniques.
  • Offshore Geotechnics : Relevance of geotechnics to subsea engineering, including soil and rock formation, types of soil and rock, seabed stability and scour, trenching and protection.
  • Trenching and Backfill Equipment: Trenching, backfill and piling operations subsea, including the equipment used and the operation factors considered for a successful operation.
  • Installation of Fixed and Flexible Pipelines and Umbilicals: Pipelay techniques including J-lay, S-lay, reel-lay, towing and umbilical lay, detailing the principles of design for installation and including the procedures and equipment used for installation.

 


Course Outline

Day 1 – Offshore Hydrography & Site Investigation

  • Introduction to Hydrography
  • IHO
  • Site Investigation – Geotechnical – Geophysical
  • Report Writing
  • Dredging

Day 2 – Subsea Survey, Positioning & Metrology

  • Positioning Techniques
  • Types of Survey Sensors
  • Acoustic Positioning System
  • Applications – Structure Installation – Subsea Metrology
  • Accuracy and Repeatability

Day 3 – Offshore Structures – Design, Transportation & Installation

  • What are Subsea Structures?
  • Who is a Subsea Installation Engineer?
  • What do they do?
  • Phases of Subsea Structures Installation
  • Subsea Vessel Selection
  • Basic Subsea Installation mathematics

Day 4 – Offshore Structures Installation – Typical Pipeline Project Illustration

  • Concept Selection & Front End Engineering Design
  • Detailed Design
  • Procurement
  • Fabrication
  • Installation
  • Commissioning, tie ins, protection

Day 5 – Subsea Control System

  • Introduction to Subsea Control Systems
  • Types of Control System
  • Where does the Control Systems fit Subsea
  • Control System Architecture

Course Registration

For Registration details; please download the form here.

For further information on course fees or content details; please contact info@chesssubseaengineering.com

Chess Subsea Engineering

Administration Team

You may also like...


Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home2/ab29608/public_html/wp-includes/functions.php on line 5464