Deprecated: Creation of dynamic property PopupAllyDefaultTemplate::$style_template_checked_replace is deprecated in /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php on line 108
Deprecated: Creation of dynamic property PopupAllyCleanTemplate::$style_template_checked_replace is deprecated in /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/clean/definition.php on line 117
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
{"id":344,"date":"2015-04-07T14:49:53","date_gmt":"2015-04-07T14:49:53","guid":{"rendered":"http:\/\/chesssubseaengineering.com\/?p=344"},"modified":"2017-07-18T15:50:52","modified_gmt":"2017-07-18T15:50:52","slug":"subsea-survey-positioning-installation-and-introduction-to-subsea-control-system","status":"publish","type":"post","link":"https:\/\/chesssubseaengineering.com\/2015\/04\/07\/subsea-survey-positioning-installation-and-introduction-to-subsea-control-system\/","title":{"rendered":"Subsea Survey, Positioning & Installation and Introduction to Subsea Control system"},"content":{"rendered":"
This course gives a detailed understanding of subsea field preparation operations.\u00a0 It discusses at length subsea survey techniques, how to position subsea systems on the seabed, subsea system installations and mathematics involved in rope selection for deployment. This course features case study of subsea system installation from project management perspective. It also introduces subsea control systems.<\/p>\n
\n
Outcome<\/strong><\/p>\n
\n
To gain total understanding\u00a0 of the basis, significance and application of subsea surveying techniques.<\/li>\n
To gain the knowledge required to understand the factors influencing the installation of subsea equipment including the effects of geotechnics.<\/li>\n
Understanding of the methods and equipment used for subsea installation of pipelines, risers and umbilicals.<\/li>\n<\/ul>\n\n
Outline Of Syllabus<\/strong><\/p>\n
\n
Subsea Surveying and Geomatics : Introduction to the principles of subsea surveying and geomatics including bathymetry and seismic surveys, positioning systems (surface positioning, visual positioning, GPS and electromagnetic positioning techniques.<\/li>\n<\/ul>\n
\n
Offshore Geotechnics : Relevance of geotechnics to subsea engineering, including soil and rock formation, types of soil and rock, seabed stability and scour, trenching and protection.<\/li>\n<\/ul>\n
\n
Trenching and Backfill Equipment: Trenching, backfill and piling operations subsea, including the equipment used and the operation factors considered for a successful operation.<\/li>\n<\/ul>\n
\n
Installation of Fixed and Flexible Pipelines and Umbilicals: Pipelay techniques including J-lay, S-lay, reel-lay, towing and umbilical lay, detailing the principles of design for installation and including the procedures and equipment used for installation.<\/li>\n<\/ul>\n
<\/p>\n
\n
Course Outline<\/strong><\/p>\n
Day 1 – Offshore Hydrography & Site Investigation<\/strong><\/p>\n
\n
Introduction to Hydrography<\/li>\n
IHO<\/li>\n
Site Investigation – Geotechnical – Geophysical<\/li>\n
Report Writing<\/li>\n
Dredging<\/li>\n<\/ul>\n
Day 2 – Subsea Survey, Positioning & Metrology<\/strong><\/p>\n