Deprecated: Creation of dynamic property PopupAllyDefaultTemplate::$style_template_checked_replace is deprecated in /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php on line 108
Deprecated: Creation of dynamic property PopupAllyCleanTemplate::$style_template_checked_replace is deprecated in /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/clean/definition.php on line 117
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
Warning: Cannot modify header information - headers already sent by (output started at /home2/ab29608/public_html/wp-content/plugins/popupally/resource/template/default/definition.php:108) in /home2/ab29608/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1831
{"id":1293,"date":"2015-04-19T00:02:45","date_gmt":"2015-04-19T00:02:45","guid":{"rendered":"http:\/\/chesssubseaengineering.com\/?p=1293"},"modified":"2017-07-18T15:42:48","modified_gmt":"2017-07-18T15:42:48","slug":"pipeline-ends-and-in-line-structures","status":"publish","type":"post","link":"https:\/\/chesssubseaengineering.com\/2015\/04\/19\/pipeline-ends-and-in-line-structures\/","title":{"rendered":"Pipeline Ends and In-Line Structures"},"content":{"rendered":"
Pipeline Ends and In-Line Structures<\/strong><\/p>\n
An in-depth approach looking at how\u00a0Pipeline Ends and In-Line Structures operate, the engineering principles involved and identifying the key areas that are often overlooked, such as managing availability and the reliability of Pipeline Ends and In-Line Structures.<\/p>\n
Delegates will have the opportunity to see what different parts of the system look like, get an independent comparison of the kit and equipment available, and gain a greater insight into this specialist area. Course instructors are core subsea professionals.<\/p>\n
\n
Key learning areas<\/strong><\/p>\n
\n
Differentiate the types of\u00a0Pipeline Ends and In-Line Structures and identify different subsea equipment and functionality<\/li>\n
Gain an in-depth understanding of how\u00a0Pipeline Ends and In-Line Structures operate<\/li>\n
Understand the issues when overseeing the design and manufacturing of Pipeline Ends and In-Line Structures<\/li>\n
Take a look at future technologies<\/li>\n<\/ul>\n\n
Contents<\/strong><\/p>\n
Day 1<\/strong><\/p>\n
\n
PLEM General Layout<\/li>\n
Components of PLEMs<\/li>\n
16-in. PLEM<\/li>\n
12-in. PLEM<\/li>\n
PLEM Design and Analysis<\/li>\n
Design Codes and Regulations<\/li>\n
Design Steps<\/li>\n
Input Data<\/li>\n
Design Methodology<\/li>\n
Structure<\/li>\n
Mudmat<\/li>\n
PLEM Installation<\/li>\n
Foundation (Mudmat) Sizing and Design<\/li>\n
Load Conditions<\/li>\n<\/ul>\n
Day 2<\/strong><\/p>\n
\n
Mudmat Analysis<\/li>\n
Overturning Capacity<\/li>\n
Penetration Resistance of Skirts<\/li>\n
Bearing Capacity during Installation<\/li>\n
Bearing Capacity during Operation<\/li>\n
Settlement Analyses<\/li>\n
PLEM Installation Analysis<\/li>\n
Second-End PLEM<\/li>\n
Static Force Balance of a PLEM<\/li>\n
Bending Load on a Pipe with the PLEM Correctly Oriented<\/li>\n
Righting Torsion with the PLEM Misoriented by 90 Degrees<\/li>\n
Bending Load on a Pipe with PLEM Misoriented by 90 Degrees<\/li>\n
First-End PLEMs<\/li>\n
Stress Analysis for Both First- and Second-End PLEMs<\/li>\n
Analysis Example of Second End PLEM<\/li>\n<\/ul>\n\n